Projects
JUMBO EMERGENCY PACKER KITS SOLD GLOBALLY
-
OceanaGold, Didipio, Philippines, 6 kits
-
Bellevue Gold, Bellevue, WA, 8 kits
-
JDS Mining, Karowe Mine, Botswana 1 kit
-
Newcrest, Havieron Mine, WA, 1 kit
-
Northern Star resources, Wonder North, WA, 1 Kit
-
BHP, Carrapateena, SA, 2 kits
-
Regis Resources, Garden Well Mine, WA,1 kit
-
Kidston Renewable energy project, Nth Qld, 1 kit
-
Evolution, Ernest Henry Mine 2 kits
-
​Barrick Gold, Kibali Mine, Congo, 1 kit
-
Tasman Mining Limited, Snowy River Mine, NZ, 1 kit
-
Bluestone Mines Tasmania, Renison, 1 kit
-
Develop, Woodlawn Mine, NSW, 2 kits
-
Ramelius Resources, Edna May, WA, 1 kit
-
Resolute, Syama mine, Mali, 1 kit
-
Pybar mining services, Lake Cowal, NSW, 1 kit
-
PT NHM, Toguraci Mine, Indonesia, 1 kit
-
​Barminco Dalgaranga mine 1 kit
-
​Lang Xang minerals Laos, 1 kit Large
​Currently quoting kits
​
-
Evolution, Red Lake Mine, Ontario Canada
-
Barrick, North Mara Mine, Tanzania,
-
Glencore,Kamoto Copper Company, KTO Underground, Congo
-
Nyrstar, Coy Mine, Tennessee, USA
-
K92 Mining, K92 Mine, PNG
KAMOTO COPPER COMPANY
Congo
Glencore
The KTO underground mining project required specialized consultation and strategic direction concerning the comprehensive management of water-related challenges associated with multiple underground aquifers, anticipated to be encountered in the proposed deep-level expansion of the mine. An evaluation of the existing drainage, pumping, and reticulation systems was also undertaken to identify and advise on enhancements to improve efficiency, aligning them with the latest industry standards best practices.

HAVIERON
Western Australia
Newcrest
Havieron required specialist advice and design criteria to control water issues and minimize risk related to intersecting water in the upcoming lower confined aquifer with high water pressures.

RENISON MINE
Tasmania
Bluestone Mines
Renison Bell required specialist advice on the long-term pumping proposal which will included a review of the LoM dirty water pumping system.

TOGURACI MINE, Gosowong Indonesia
Newcrest
Mineright was tasked with a dewatering target of 450 l/s of 80 degree Celsius (176 degree Fahrenheit) water from a narrow vein hydrothermal deposit of high grade gold.
Mineright designed and managed construction of the underground dewatering project to safely de-water below production levels to extend mine life. This included consolidating and improving current capital pump station infrastructure to maximize ex-mine water and to add contingency to avoid flood events. Specific design of deep bore installations and reticulation pathways through return air ways to better manage heat transfer and workforce exposure to hot water. Simplify and automate the system to better manage power outages and pump failures.
Redesign lower decline to manage hot water flows and mining fronts with active dewatering cuddies and satelite pumping systems.
.jpg)
BELLEVUE GOLD MINE
Western Australia
Bellevue Gold
Mobilize to site to assist in successfully installing a Mineright Packer into a development hole in the Main Decline that intersected an ungrouted diamond drill hole connected to a high pressure aquifer.

ERNEST HENRY MINE,
NW QLD Australia
Xstrata, Glencore, Evolution
Consult and manage lateral and shaft development through water bearing structures with high water pressures, temperatures and volumes using a combination of cement grout, resin injection and upgraded pumping system designs.
Mineright developed a dewatering system to lower the confined aquifer 560 metres to a manageable level for mining.

SNOWY RIVER PROJECT
New Zealand
Federation Mining
Working with the client and diamond drill contractor to successfully engineer and drill a dewatering hole into old workings with 540 metres of head to allow mining to continue without the risk of innundation.

GARDEN WELL GOLD MINE
Western Australia
Regis Resources
Set up monitoring and design dewatering system for multi compartmentalized aquifer system to allow production to continue on schedule.

SYAMA MINE,
Mali Africa
Resolute
Decline development intersected a diamond drill hole connected to the open pit full of water which inundated the decline for 8 weeks. Mineright audited and trouble shooted the pumping and water management system which successfully allowed for a hasty reestablishment of the decline within 7 days.
Formulate and design the Syama Underground Water management plan for early stages of a large sub level cave mine, with open pit catch sumps and underground storage facilities with precipitation averaging 1100mm per year.
Design the underground water management plan LOM

DIDIPIO MINE,
Philippines
OceanaGold
Mineright consulted on mine design for water management, pressure grouting and pump design for expected high water inflow into the underground mine.
Mineright designed the underground water management and drainage plan to operationally control high water inflows.
Mineright designed the capital pump station and storage system for 450 l/s peak inflows.
Mineright supplied tapered plugs and Jumbo packers to be used by the jumbo in and emergency when historic diamond drill holes were intersected.
Mineright trained Jumbo operators on installation of Mineright Packers in high pressure high water volume diamond drill hole intersections in development faces as well as train personnel on grouting through packers with high pressure grout pump to fill hole and de-risk development.

CERRO BLANCO GOLD MINE
Guatemala
Bluestone Resources
Consult on dewatering and water management, including safety requirements for 140 degree Celsius water in a narrow vein hydrothermal gold mine.